3 Days After Inauguration, Karnataka's Floating Bridge Built At Cost Of Rs 80 Lakh Collapses

112°
Tech Guru
BAT_MAN

3 Days After Inauguration, Karnataka’s Floating Bridge Built At Cost Of Rs 80 Lakh Collapses

The bridge at the Malpe beach in Udupi, inaugurated by MLA K Raghupathi Bhat on May 6, was damaged on the night of May 8-9 by huge waves

Pieces of the bridge were seen floating in the water in a video, but the leaseholder, Sudesh Shetty, said the bridge had in fact been “disconnected to avoid damage” due to the cyclonic weather.

Expired
2 Comments  |  
3 Dimers
  • Sort By
Generous Generous
Link Copied

80 lakhs from govt gone waste. Or rather someone in the govt earnt 32 lakhs in this project , going by our 40% commission government.

Seriously, how can such a plastic floater bridge cost 80 lakhs to build? Everyone made money here smile

Deal Cadet Deal Cadet
Link Copied

One guy built a small island using plastic waste bottles. and Indian gov is spending money 😂

replyuser
Click here to reply
Reply